(Almost) Finished project with Carpet Installed
- Carpet cut and installed
- Finishing up Fat Mat on all interior sidewall panels
- Temporarily closed off the side wall holes
- Will work on doors next when I have my Inverter system drawn out to spec.
You'll notice I have temporarily sealed off the rear quarter panel area with Fat Mat and Duct Tape.
I'm trying to finish up a few other projects at the same time and I'm going to be working with
@
IBallEngineer
with a solid robust inverter system. There's the potential of using that available space on both sides.
A word of advise for anyone beginning this project:
PRIORITIZE your projects accordingly:
- Engine (TB/WP/MAF/Plugs/Oil/New Radiator/etc...)
- Transmission (Tranny Cooler/Fluids)
- Suspension (LBJ's/OTRE/ITRE/13WL Mod with Big Tires)
As tempting as it is...any other mod is non-essential and can always wait.
Enjoy and fire away with the questions...
__________________
2001 Imperial Jade Gold Letter Sport Package - Original Owner