Just ordered the joints from MetalCloak and four 1"-14 thread tube adapter bungs for 1.5" ID tubing from Trail Gear. I realized that the 1.75" tubing I had in the garage was HREW, so I had to go to the metal supply to pick up tubing. Since I was there I said screw it and went with 2" x .250" wall for the lowers and 1.75" x .120" wall for the uppers. Now I don't have any excuse to mess these ones up. I got some extra 1.75" tubing to hopefully start my front bumper soon. Pretty stoked on getting this part of the build out of the way. Now I might have to wait a little longer to get new tires since I dipped into my tire and front UCA funds. Hopefully by the end of February I can get those finished though.
Sent from my iPhone using Tapatalk