Quote:
Originally Posted by doofenshmirtz
So the rubber sheet came in, and it was a perfect size for the splash guards. The metal templates made things really easy. I just traced everything with a sharpie and then used tin snips to cut the sheet: it was like cutting paper using those... I grabbed a drill bit to do all the holes.
I’m pretty sure it took longer to pull out all the old fasteners than it did to trace and cut the new rubber pieces, but I was done in less than an hour.
While I was down there, I noticed a nut had come off my sway bar so I fixed that after I took the picture. I spent a total of $33 on everything, which includes a few hundred more cheap Chinese fasteners.
Sent from my iPhone using Tapatalk
|
Do you have a link for the fasteners?