Quote:
Originally Posted by Drobs
Looking to turn my 4 crossbars into a 7/8's roof rack.
Is there a video on installing the side rails? Exactly how many more cross bars do I need? I'd like to add at least 2 of the wide cross bars.
I'm not in a hurry but what is the lead time? I note lots of things are showing back order.
|
All depends on what you want to use the rack for. You don't need to add any for structural purposes, we've run racks with only two crossbars before.
The wides give a bit more flexibility in use, and you can also bolt a rotopax mount directly to it.
Installing the rails is pretty straightforward, just need to make sure you caulk around each of the roof mount holes well before installing the mounting spacers.
Lead time varies, right now for side rails and a front fairing only its just a couple weeks, for complete racks its averaging more like 5 weeks.