Here's a very short video I made and edited on my phone of the end of day 1 of the build. Here is the end of cutting out the front crossmember in the front. In the end we have removed the entire IFS system and the rear axle from the 4R. I have over 4 hours of video from 2 gopro's on top of this. I will work through this content and upload it later this week. As always a big thanks to the team at Budbuilt. It was a great and productive first day. We removed the entire IFS system, front diff, steering system, entire rear axle, 4 links and panhard bar.