@
tundradan
I’ve had the 2.0 bracket built as a prototype and it turned out perfect. I’m set to have a “run” of them built. They should be done in the middle of January. I’ll order all the other various hardware and components on the first of January and it should be here when the brackets are ready. Once I have everything it takes me a few days to put everything together and package it all up.
The first run I produced was really a test for me to get my processes down. I now have my quality control steps in place to ensure that there will be zero issues on the customer end.
Once I get the next batch produced, barring some catastrophe, I shouldn’t run out of stock again.