03-05-2020, 06:56 AM
|
#1
|
Member
|
|
Join Date: Dec 2018
Location: ohio
Posts: 123
|
|
Member
Join Date: Dec 2018
Location: ohio
Posts: 123
|
Adding LED light bar to hi beams
I'm adding an LED light bar and I want to tie into the hi beams, I got 2 wiring extension cords from the retro fit shop where I got my hi beam bulbs from, this way I don't have to cut into the factory wiring. My question is, is tapping into one side going to be enough power for the light bar and will the side I tap into be dimmer if I don't tie into both side? Thanks!
|
|
Reply With Quote
|
03-05-2020, 08:11 AM
|
#2
|
|
Senior Member
|
|
Join Date: Oct 2007
Location: Greenville, SC
Age: 44
Posts: 1,297
Real Name: Mike
|
|
Senior Member
Join Date: Oct 2007
Location: Greenville, SC
Age: 44
Posts: 1,297
Real Name: Mike
|
You shouldn't share the same connection as the factory highs to be the sole power source. You will overdraw the circuit and likely blow the fuse.
You can however take a relayed harness that tees off of one of the factory high beam plugs to be your signal or trigger source for the relay. This is the way all added light fixtures should be wired.
This will also have no negative effects that your concerned about as well.
__________________
SOLD2007 4Runner Sport Edition V6 4X4 - Natural White - Perf: Doug Thorley Long Tube Headers | 4.56 Gears ARB Front / TrueTrac Rear Off Road: Fr: Bilstein 6112 w/1/2" Toytec Spacer / Rr: MT ICON Long Travel | JBA UCAs | VTX Rogue 17x8.5 -10 | GY Duratrac 285/70R17 | Rear Diff Breather Mod | 1" Toytec Body Lift | Custom Cut Axle Joints ICE: Auto Pumpkin 10.1" Android | 3.5" Tweeter Mod Exterior: Quad Bi-Xenon HID Retrofit
2019 4Runner Limited 4x4 - MGM - Hers | Ironman4x4 FCP's & UCA | Fuel Rebel 20x9+1 | GY Duratrac 275/60R20 | Victory 4x4 FLRR
|
|
Reply With Quote
|
03-05-2020, 08:22 AM
|
#3
|
Member
|
|
Join Date: Sep 2015
Posts: 283
|
|
Member
Join Date: Sep 2015
Posts: 283
|
Like he said you should use the high beam power wire to signal a relay. Very easy to wire.
|
|
Reply With Quote
|
03-05-2020, 10:25 AM
|
#4
|
|
Elite Member
|
|
Join Date: Mar 2010
Location: Pittsburgh
Posts: 5,690
Real Name: Chris
|
|
Elite Member
Join Date: Mar 2010
Location: Pittsburgh
Posts: 5,690
Real Name: Chris
|
Yep, you'll want to use the relay harness for the LED bar
__________________
2017 Nautical Blue SR5 Premium - Black Emblems, AFE 76mm TB, AFE Momentum GT Intake, URD MAF Calibrator, Borla Touring Cat-Back Exhaust, VR ECU Tune, RCI Skid Plate, Morimoto MLED 2.0 Headlight Retrofit, Morimoto LED Fogs, Eagle Eye Smoked Black Tail Lights, FyreFlys LED Interior, Meso Puddle Lights, Tinted Mirror Turn Signals, Smoked Amber Raptor Lights, Odyssey 34 Battery, 32" LED Bar with Rago Hidden Brackets, Rago Molle Panels, Side Shooter LED Ditch Lights, sPod w/ PowerTray, Raceline Matte Bronze Wheels w/ Cooper Discoverer RTX, CaliRaised Rock Sliders, BajaRack Full Length Roof Rack, Kenwood DMX1057XR, Infinity Kappa Door Speakers and 3.5's in dash, JL 8w3v3 in JBL Enclosure, Husky Weather Beaters, Blackvue DR900S Dash Cams
|
|
Reply With Quote
|
03-05-2020, 12:36 PM
|
#5
|
Member
|
|
Join Date: Apr 2018
Location: Sacramento, California
Posts: 327
|
|
Member
Join Date: Apr 2018
Location: Sacramento, California
Posts: 327
|
All you need is a SPDT on-off-on switch and the relay harness that might have come with your light bar.
Switch common goes to the relay coil, load one goes to the battery with fuse, load two taps into the high beams.
The switch in the middle position will keep the light bar off no matter what. The next two positions allow manual on and high beam on.
|
|
Reply With Quote
|
03-05-2020, 01:23 PM
|
#6
|
Member
|
|
Join Date: Sep 2015
Posts: 283
|
|
Member
Join Date: Sep 2015
Posts: 283
|
There me be an issue where the DRL's send power to the HB bulbs and turn the rely on?
|
|
Reply With Quote
|
03-05-2020, 08:50 PM
|
#7
|
Member
|
|
Join Date: Jul 2016
Location: MD
Posts: 291
Real Name: Mike
|
|
Member
Join Date: Jul 2016
Location: MD
Posts: 291
Real Name: Mike
|
I would advise against it all together. Run a separate switch with a relay.
Here is why: In some states its illegal to have more then 4 forward facing lights on at a time. Also I am pretty sure the light is not DOT approved, and or will violate some other on the road light law.
SPods systems are nice. You can alsouse push switches that fit into the factory blanks, so you don't need a whole spod system.
__________________
Humankind cannot gain anything without first giving something in return. To obtain, something of equal value must be lost.
|
|
Reply With Quote
|
03-05-2020, 11:13 PM
|
#8
|
|
Member
|
|
Join Date: Sep 2011
Location: Near Pittsburgh, PA
Posts: 203
Real Name: Bob
|
|
Member
Join Date: Sep 2011
Location: Near Pittsburgh, PA
Posts: 203
Real Name: Bob
|
I agree with
@ dade73
. Personally I don’t feel it’s a good idea to tie to the high beams since you cannot defeat it if law enforcement doesn’t like it. I don’t pretend to know the law here but frankly wouldn’t push it.
I have 2 hidden light bars behind the grill operated by BOTH an sPod and dash switches. I only put in the dash switches because I liked the looks. But the sPod touch screen is really fantastic and can turn off/on simultaneously. The sPod is expensive but IMHO worth every penny
Just my opinion
Cheers
Sent from my iPhone using Tapatalk
__________________
2018 TRD ORP, MGM, Xpel 35% Tint, Xpel Clear Bra, In-Dash 2m/70cm Icom Radio, Dual-band 1/4 wave antenna with Rago Mount, sPod Bantam, 2 x 32" behind the grille LED lightbars, Cali Raised 3-way Fog Lights.
Sold: 2011 SR5
|
|
Reply With Quote
|
03-06-2020, 01:40 AM
|
#9
|
Member
|
|
Join Date: Apr 2018
Location: The galactic center
Posts: 210
|
|
Member
Join Date: Apr 2018
Location: The galactic center
Posts: 210
|
I have 2 rigid pods and a cheap hidden light bar that is tied to my high beams with a switch and relay. Super easy to do. Just wire the relay, lights, and switch as you normally would, but run the trigger wire from the switch to the hot wire of your high beams at the bulb end. I used a cheap adapter so I did not have to tap into my factory wiring. With this configuration, I can run my high beams as normal. When my switch is activated, the lights will turn on when I turn on my high beams and will turn off once the high beams are turned off. I honestly rarely use it.
You will also pass inspections, if that's a thing for you, with this setup. Just make sure that the switch is off before the inspection.
|
|
Reply With Quote
|
03-06-2020, 02:42 AM
|
#10
|
|
Senior Member
|
|
Join Date: Dec 2012
Location: Clearwater Kansas
Posts: 1,301
|
|
Senior Member
Join Date: Dec 2012
Location: Clearwater Kansas
Posts: 1,301
|
You just don't want to add things to existing circuits for a couple of reasons. As already stated there may be issues with it being legal and if the circuit fails somehow, it could cause the factory lights to fail as well. Also, you really need to know what the current draw of this light bar is before connecting it; so as to insure you are using the proper fuse and wire size.
|
|
Reply With Quote
|
03-06-2020, 08:13 AM
|
#11
|
Member
|
|
Join Date: Sep 2015
Posts: 283
|
|
Member
Join Date: Sep 2015
Posts: 283
|
Quote:
Originally Posted by kelkins
I have 2 rigid pods and a cheap hidden light bar that is tied to my high beams with a switch and relay. Super easy to do. Just wire the relay, lights, and switch as you normally would, but run the trigger wire from the switch to the hot wire of your high beams at the bulb end. I used a cheap adapter so I did not have to tap into my factory wiring. With this configuration, I can run my high beams as normal. When my switch is activated, the lights will turn on when I turn on my high beams and will turn off once the high beams are turned off. I honestly rarely use it.
You will also pass inspections, if that's a thing for you, with this setup. Just make sure that the switch is off before the inspection.
|
This is how I've done it in the past. Your having no issue with the DRL's turning the relay on?
|
|
Reply With Quote
|
03-06-2020, 08:43 AM
|
#12
|
Member
|
|
Join Date: Apr 2018
Location: The galactic center
Posts: 210
|
|
Member
Join Date: Apr 2018
Location: The galactic center
Posts: 210
|
Quote:
Originally Posted by adrtoy
This is how I've done it in the past. Your having no issue with the DRL's turning the relay on?
|
No. I also keep the switch off unless I plan to use them.
|
|
Reply With Quote
|
03-07-2020, 01:18 PM
|
#13
|
Member
|
|
Join Date: Dec 2018
Location: ohio
Posts: 123
|
|
Member
Join Date: Dec 2018
Location: ohio
Posts: 123
|
Thanks for the replays. My light bar did come with a harness (Ridig) so I'll use it instead of my original plan of just tapping into the wires to the hi-beam bulb.
|
|
Reply With Quote
|
03-07-2020, 02:31 PM
|
#14
|
Member
|
|
Join Date: Nov 2018
Location: NH
Posts: 229
|
|
Member
Join Date: Nov 2018
Location: NH
Posts: 229
|
on the early trucks the DRL's are independent of the headlights so I triggered my LED driving lights off the high beams. I do have a switch for them but I just leave it on. They come on automatically with the high beams and shut off with them also. I do use them pretty much all the time I use my high beams. I have had regular independently switched driving lights in the past. After not being able to get to the switch quick enough when a car was coming and getting flashed a few times I pretty much stopped using them altogether. If you're truly going to ONLY use them off road that's another thing entirely. I had some lights wired exactly like I have on my 11 on a 00 4Runner my now ex wife drove for 10 years. That had DRL's that were the high beams on 1/2 power. And yep they triggered the driving lights and she drove around with them on ALL the time.
__________________
Toyota 4x4 #17 - 2011 4Runner Trail Edition
|
|
Reply With Quote
|
03-07-2020, 05:45 PM
|
#15
|
|
Member
|
|
Join Date: Jun 2019
Location: Washington DC
Posts: 932
|
|
Member
Join Date: Jun 2019
Location: Washington DC
Posts: 932
|
Quote:
Originally Posted by dade73
I would advise against it all together. Run a separate switch with a relay.
Here is why: In some states its illegal to have more then 4 forward facing lights on at a time. Also I am pretty sure the light is not DOT approved, and or will violate some other on the road light law.
SPods systems are nice. You can alsouse push switches that fit into the factory blanks, so you don't need a whole spod system.
|
Actually FMVSS 108 only allows for two lights to be on at a time (i.e. both headlights or both highbeams) and several states do not allow auxiliary lights to be on the road uncovered, meaning they must be physically covered.
__________________
When in trouble - obfuscate
|
|
Reply With Quote
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is On
|
|
|
|