I have completely started over and did my system over. Figure i woudl share it with you guys.
This will be used to compete in Iasca SPL rookie class this year. Sill allot of work to do but here is what I have done so far.
Not finished yet but here is what i have left to do..
-Glass box on the inside
-round out box corners
-brace box on inside
-seal the top
-carpet the outside
-big 3
-run the 0g power wire
-add second nine.1
-build amp rack
-install the 6000's
-edead the front door
- add edead to factory panels in the rear
-Misc stuff
But on to what is done already, With the help of a freind a box came to life. Must say even though it was cold as heck outside he knocked this thing out in no time.