97 Limited.
This weekend: Changed all rear drum hardware, shoes, cylinders, bell cranks. Brake booster and master will be done today with SS brake lines in front.
Ahead - Have U and L balls joints. Will be doing the struts and shocks. Control arms, tie rods etc.
Doing entire undercarriage...