• If you plan to post to Classified forums, you must follow these rules, or your post will be deleted.

    1. Thread title must include at a minimum: FS or FT, Item(1st, 2nd, 3rd, 4th or 5th gen), Price and Location. For Example: FS: 4th GEN Carpet Floor Mats - Tan, $50 Denver, CO.
    2. All Threads must contain the following information
      • What is for sale/trade (model, specs, etc.)
      • Condition
      • Price/What you want to trade for
      • Location of item
      • At least one picture of the item for sale or for trade
    3. No "Feeler" Threads - Its either for sale or it isn't.
    4. Moderators lock Classified Threads that have not had any activity in 90 days or when the part is announced SOLD.
    5. Threads not complying with the rules will be deleted without notice.

Final Call: Shrockworks *Summer 2018* Group buy

Mine went off to Powdercoat today. Someone asked me for pics of the underside but I can’t find their original message to reply. So I’ll post them here


U24ZSIQ.jpg

7yS2xL5.jpg
 
Last edited:
I picked them up from powdercoat, they look awesome. Threw them on. The install was not too bad. Awkward positions, stick nuts, gas tank skid removal. All in all, they bolted right up.

wGZJtNR.jpg

hycwMSV.jpg

PX9AMwr.jpg

 
Hey Jarheadoo7 = RS look great! were all the bolts/holes lined up no special mods? (I read some posts on previous models that seemed to need a new hole drilled!)

BTW - great tires too - what brand are those?
Tom in SOCAL
 
Hey Jarheadoo7 = RS look great! were all the bolts/holes lined up no special mods? (I read some posts on previous models that seemed to need a new hole drilled!)

BTW - great tires too - what brand are those?
Tom in SOCAL

Thanks Tom, tires are duratracks by Goodyear. Came w the truck and I like them.

On my ‘15 all the holes were there that I needed. I probably won’t be going through the MOAB and sliding these on the cliffs of Dover so I was ok with getting 3 bolts on each leg (I have the two leg version). The instructions do say you can drill another hole for the trans crossmember but I didn’t see the need to do that for my level of use.
 
Last edited:
I've sent Shrockworks two emails, no response, just trying to get an expected delivery date. Anybody have any luck contacting them?
 
I've sent Shrockworks two emails, no response, just trying to get an expected delivery date. Anybody have any luck contacting them?

Haven't heard shit back. This kinda sucks. When I ordered from other metal fabs, they gave me a completion date up front, and stuck to it. I mean, you have to create a manufacturing schedule, right?
 
Haven't heard shit back. This kinda sucks. When I ordered from other metal fabs, they gave me a completion date up front, and stuck to it. I mean, you have to create a manufacturing schedule, right?

Were those other orders part of a Group Buy, or direct purchase?
 
Were those other orders part of a Group Buy, or direct purchase?

Should it matter? We're not demanding our parts(even though it's been 10 weeks), just asking for a response to one of several messages. I've had awesome customer server from both RCI and CBI on group buys. Not responding to a customer after they payed is bullshit.
 

Members online

No members online now.

Forum statistics

Threads
278,316
Messages
3,554,121
Members
248,016
Latest member
Advally Service

Trending content

Back
Top