here is my ole girl
rock sliders are 50% complete (drivers side is complete), Lockrite locker in the front,aussie locker should be here with in the week for the rear, and wait`n on new piston rings then she`ll have fully rebuilt 3vze, and to top it a 5spd swap with new 32" goodyear mt/r kevlar