Yoterman87
New member
So we got all this free steel so we decided to put the old welder to good use.
so we first took CM's bumper off to get an idea of what we wanted to do.
We knew we wanted to get the hitch reciever as high as possible, since we both have the 2" body lift we decided to run a 3" box in between the frame and the body and make a "C" around the frame. So i started welding.
so we first took CM's bumper off to get an idea of what we wanted to do.
We knew we wanted to get the hitch reciever as high as possible, since we both have the 2" body lift we decided to run a 3" box in between the frame and the body and make a "C" around the frame. So i started welding.