Don't know if this helps at all but I am a mostly pretty happy drabbits customer. I ordered in May of 2015 and received in November. It was late but pretty much as expected from what I have seen in the forums. I had about a 50% response rate on emails, but better than expected based on the forums. The rack itself is beautiful, crafted by someone who cares. The powder coat has been through a Manitoba winter and is flawless despite a sausage-fingered owner. The only rust is on the hardware which is stainless steel. However, unless you have stainless dedicated tools (I dont) any marring left behind by your tools will rust on top of the stainless. I certainly have seen that on EVERY gobi rack I have seen. All in all, I feel the pleasure is worth the pain. That decision is up to you, but it is a unique product that suits my needs perfectly. If Alex could figure out the lead times and communications he would be ahead of anyone else I have seen. Genius often comes with a bit of quirk.