Installation time

Honestly it really comes down to if you have the right tools and if you run into any stubborn nuts, bolts, etc, etc. Where are you located? Most of us here love wrenching on these things and are down to help a fellow member out.

Pretty sure he's got the right tools,
Surprised you didn't do that before your last retro
 
well seeing that this was brought up, how long do you think LC 8wraps and shocks would take? just those two. with a full lift?

If you cut your shocks off, less then an hour. If you are going to undo those dirty Jersey rust nuts, it might take you five hours.
 
Damn that was a quick install time. I had to experience installing my lift and it took me over a two day period like 12+ hours because of rust. It was about 6 hours for my front driver side and I had to take an air chisel to get it off. I really hate rust. Congrats!
 
lol i have NO intention to fight with rusty nuts and bolts. i have a full oxyacetylene setup at work. the luxury of full lifts and tall jack stands. hopefully i set a new record for a coil spring and shock install.
 

Members online

Forum statistics

Threads
278,305
Messages
3,554,041
Members
248,016
Latest member
Advally Service

Trending content

Back
Top