Recent Build Dates vs actual Delivery Date

I put down my $500 deposit on a Trail edition 4x4. I was told it would take around 1-2 months, but by the looks of the previous posts, seems like it will take longer. I ordered the bare minimum of the trail model. There’s one exactly like the one I ordered that, around 200 miles away, but can get sent to my local dealership. Only problem is, it has the “premium audio” package, raises the MSRP by around $1350. Should I just get that? Or wait for my order?

Personally, I would, just do prevent having to wait. It all depends on your circumstances though.
 
Personally, I would, just do prevent having to wait. It all depends on your circumstances though.

My dealer contacted me yesterday letting me know that they are receiving a Cement Gray 4Runner with the same specs as I had selected, so I went ahead and put my deposit on that. My ETA for that now is about 2-3 weeks, so I'm pretty happy.
 
My TRD Pro was built 6/24

Left Japan 7/7 and was told it would arrive to port 7/21


I wonder when it will be at the dealership?
 
I put my deposit down on a silver Venture on 7/9. It was set to be built that day or the next. They quoted me a 4-6 week delivery to the dealership.

We shall see!


Sent from my iPhone using Tapatalk
 
Hello I put a deposit down a 4runner Limited on 6/30 and sent the information of what I wanted in terms of colors for exterior and interior to the dealer. The dealer told me it could take up to 4 months to have it built. I had on no extras added on to it just the basic limited model, I didnt want running boards or third row. I'm curious how long until the build date or if they'll send me that information. So far I have heard nothing but I know it's only been two weeks, im just excited. So how long until you guys got info on your build?
 
I ordered a Lunar Rock TRD Pro on 6/27. It was built on 7/7 and is supposed to arrive at the Port on 7/28. Then it has to get from Oregon to Ohio after the TRD parts are installed. I don’t expect to see it until mid September at the earliest.
 
Deposit on a in-pipeline TRD Off Road Premium w/ moonroof and KDSS on Saturday 6/19
Built on Thursday 6/24
Received at Long Beach on Monday 7/12
Arrival at dealer (Earnhardt in AZ)
- Initial estimate when the deposit was made: 2 weeks from receiving
- Current estimate once received in Long Beach: 4 weeks from receiving
 
Last edited:
Does anyone have contact info for a Toyota North East regional rep?
My dealer still hasn't not received info regarding my order.
 
Deposit on a in-pipeline TRD Off Road Premium w/ moonroof and KDSS on Saturday 6/19
Built on Thursday 6/24
Received at Long Beach on Monday 7/12
Arrival at dealer (Earnhardt in AZ)
- Initial estimate when the deposit was made: 2 weeks from receiving
- Current estimate once received in Long Beach: 4 weeks from receiving

My TRD Off Road Premium was on the same boat as yours, same arrival date. I live about an hour away from the port. No details from the dealer yet on delivery, just "maybe next week". They said the same thing last week! The suspense is killing me
 
Put down a deposit on a TRD Off Road that is in the pipeline so it would be allocated to my dealer. Was told build date is 8/2 with it arriving at my dealer late August early September.
 
My dealer just gave me a monthly timeline that it could take up to 4months. They never gave me a build date or anything like that. Should I ask them when it is going to be built? I put a deposit down three weeks ago and haven't heard anything
 
My dealer just gave me a monthly timeline that it could take up to 4months. They never gave me a build date or anything like that. Should I ask them when it is going to be built? I put a deposit down three weeks ago and haven't heard anything

Regardless if it is a TRD Pro, it sounds like the dealer doesn't have allocation (VIN), in which case it's anyone's guess when they'll get your trim...
 
Put my deposit down about 3 weeks ago. It had already cleared customs at that time. Supposed to get it any day now. Been stuck at the local rail yard for 3 days.

Apparently the shortage in truck drivers is causing a small delay. Was quoted the 19th- 24th when we put the deposit down so technically still in that window.
 

Members online

Forum statistics

Threads
278,312
Messages
3,554,089
Members
248,016
Latest member
Advally Service

Trending content

Back
Top