• If you plan to post to Classified forums, you must follow these rules, or your post will be deleted.

    1. Thread title must include at a minimum: FS or FT, Item(1st, 2nd, 3rd, 4th or 5th gen), Price and Location. For Example: FS: 4th GEN Carpet Floor Mats - Tan, $50 Denver, CO.
    2. All Threads must contain the following information
      • What is for sale/trade (model, specs, etc.)
      • Condition
      • Price/What you want to trade for
      • Location of item
      • At least one picture of the item for sale or for trade
    3. No "Feeler" Threads - Its either for sale or it isn't.
    4. Moderators lock Classified Threads that have not had any activity in 90 days or when the part is announced SOLD.
    5. Threads not complying with the rules will be deleted without notice.

Shrockworks *Spring 2017*

Since it closes the end of April does that mean orders won't be processed until then? Meaning expected delivery 3+ months after the end of April?
 
I'm down, but I have to check funds with the wife, will PM when final


Sent from my iPhone using Tapatalk

No problem bro just let me know.

So that begs the question, what is the magical number of participants needed or products ordered to get free or discounted shipping? :fishing:

I am going to have to ask Mark about this but I doubt it. 15 percent off is already pretty good and the amount you save will prob cover your shipping.

Since it closes the end of April does that mean orders won't be processed until then? Meaning expected delivery 3+ months after the end of April?

My rock sliders came in at about 6-8 weeks.
 
Everyone who has Pm'd me has been added. Assuming everyone sticks to the group buy and doesn't fall out. We have 5 more products and we hit the 15 percent marker.
 
Does anyone know if you can mix and match Shrock skids with RCI? I have an RCI front skid (4th gen) because I got in on the GB, but it got expensive with shipping so I only bought the only one I really needed (mine was rusted through from the previous owner). If I can mix and match, this GB with free shipping is really tempting to fill in the rest.
 
Does anyone know if you can mix and match Shrock skids with RCI? I have an RCI front skid (4th gen) because I got in on the GB, but it got expensive with shipping so I only bought the only one I really needed (mine was rusted through from the previous owner). If I can mix and match, this GB with free shipping is really tempting to fill in the rest.

[MENTION=108598]02ShrockRunner[/MENTION] maybe he can fill you in on that.
 
Since it closes the end of April does that mean orders won't be processed until then? Meaning expected delivery 3+ months after the end of April?

Front bumpers and rears run 3 months
Bare skids run 1 to 2 weeks
Powder coated skids 3 to 4 weeks
Sliders run 6 to 8 weeks

These are all the average lead times .

If the groupbuy closes end of april then orders will be taken at that time and the clock starts at the order dates.

Thanks
 
Would really love to have some sliders from this group buy but I would really like to have them before Jambo on May 4-7 (which is outside of the timeline). I'm local, could even pick them up. I was considering having Javier's Crawl Shop fab me some but may jump on this if their schedule is full.

But if Shrockworks has some bolt-on 4th gen sliders lying around already made......dibs.
 
Ok guys we have hit the 20 products for 15 percent off. How about we wait for a couple more just in case people flake and I will possibly end the group buy early.
 
Ok guys we have hit the 20 products for 15 percent off. How about we wait for a couple more just in case people flake and I will possibly end the group buy early.

Josh, thanks for putting this together. The first 20 came quick.....would SW do 20% if we could get 20 more orders added to the group buy?
 
Last edited:

Members online

No members online now.

Forum statistics

Threads
278,312
Messages
3,554,089
Members
248,016
Latest member
Advally Service

Trending content

Back
Top