I'm wondering how much checking is "too much" checking. We have a vertical 8" beam, about 10' long supporting the far corner of our patio. The house was framed early 2014. There was some initial checking a few months in, which I understand is just the nature of wood. But the cracks have continued to expand on all 4 sides, some almost the full length of the post and over 1/4" wide.
I had an inspection and he agreed that it was a concern... but i get the feeling these guys tend to tell you what you want to hear, at least that was the case with other items.
My concern is about structural stability and exposure to moisture intrusion. The builder tried filling it in with caulk before and that obviously did its own expansion and contracting and now looks like sh_.
Anyway, how much checking is too much checking if checked wood checks too much?
I had an inspection and he agreed that it was a concern... but i get the feeling these guys tend to tell you what you want to hear, at least that was the case with other items.
My concern is about structural stability and exposure to moisture intrusion. The builder tried filling it in with caulk before and that obviously did its own expansion and contracting and now looks like sh_.
Anyway, how much checking is too much checking if checked wood checks too much?