Y .Yukon. New member Oct 9, 2010 #1 Putting some work in tomorrow on the rig and can't wait. OME 3" lift, diff drop running board delete and if I can talk the wife into it new tires...I'll post some before and after picks as soon as possible.
Putting some work in tomorrow on the rig and can't wait. OME 3" lift, diff drop running board delete and if I can talk the wife into it new tires...I'll post some before and after picks as soon as possible.
runnyrunnerton New member Oct 9, 2010 #3 Same here! Been sitting on my Toytec Ultimate Kit for 2 weeks! I just woke up, time to head to the shop. Finally I get to start a build thread!:frog:
Same here! Been sitting on my Toytec Ultimate Kit for 2 weeks! I just woke up, time to head to the shop. Finally I get to start a build thread!:frog: