having fun
New member
Well it's been awhile with changes in life and not much time to do things.
Finally found some time to do some up grades, and finish some other items that I have neglected.
Finally had someone bend some tubing for me so I could weld up a ladder on the swing arm.

In addition, bent some additional tubing to make a Jerry can holder that is removable.


Tax time was good. So hooked her up with some Icon 56550 LT shocks. Now I can utilize them Overland coils. Had to put some off set MT trailing arms also. She flexes now.
Changed out all brake lines to braided.
Tires where getting worn out, so up graded to some 315 Cooper STT PRO.
Extended bump stops. Relocated the license plate, and shifted over and lowered the tire carrier. Dayum tire too heavy to lift that high.
Never could get any members with v6, that changed to 886 coils to respond. So I took a chance and picked up a set. Dam near leveled the ride out. 3/3" lift prior.
Over that now in the front. Without having CV binding at full wheel drop.
Of course with these tires, had pinch welds prepped prior, and been cutting up a lot of plastic.
Almost done. Maybe next year will be finished. Yeah right.
Finally found some time to do some up grades, and finish some other items that I have neglected.
Finally had someone bend some tubing for me so I could weld up a ladder on the swing arm.

In addition, bent some additional tubing to make a Jerry can holder that is removable.


Tax time was good. So hooked her up with some Icon 56550 LT shocks. Now I can utilize them Overland coils. Had to put some off set MT trailing arms also. She flexes now.
Changed out all brake lines to braided.
Tires where getting worn out, so up graded to some 315 Cooper STT PRO.
Extended bump stops. Relocated the license plate, and shifted over and lowered the tire carrier. Dayum tire too heavy to lift that high.
Never could get any members with v6, that changed to 886 coils to respond. So I took a chance and picked up a set. Dam near leveled the ride out. 3/3" lift prior.
Over that now in the front. Without having CV binding at full wheel drop.
Of course with these tires, had pinch welds prepped prior, and been cutting up a lot of plastic.
Almost done. Maybe next year will be finished. Yeah right.


















