C4 Fabrication
New member
Anyone know what the current lead time is for their sliders?
When I ordered mine on 9/14, the lead time was 6-8 weeks.
That's correct, current lead time is still 8 weeks.
Anyone know what the current lead time is for their sliders?
When I ordered mine on 9/14, the lead time was 6-8 weeks.
That's correct, current lead time is still 8 weeks.
Interested in getting the RCI sliders with the kick out. Stuck on the 5* vs 20*. I will be putting a RTT up top so I definitely want the rear kick out but not sure the angle. Not really planning to use the sliders as steps other than the RTT access as mentioned however I will be getting an ICON stage 7 suspension upgrade in the near future. Thoughts?