Ron4RNevada
New member
First side took 1 1/2 hours.
Second side too 1/2 hour.
Ground clearance under mountings about 9 1/2 inch - just about the same as fuel tank skid plate (see last photo).
They sound like a 3" diameter 5' long tin can on a gravel road - oh well -
Very solid construction and only about $145 shipped from CARiD.
Second side too 1/2 hour.
Ground clearance under mountings about 9 1/2 inch - just about the same as fuel tank skid plate (see last photo).
They sound like a 3" diameter 5' long tin can on a gravel road - oh well -
Very solid construction and only about $145 shipped from CARiD.