Cali Raised was the only company I found that offered molle panels for 3rd row seat options.![]()
![]()
![]()
Sent from my iPad using Tapatalk
Was easy enough to install but the one thing that caught my attention that majority of the screws were not long enough to reach the nylon of the lock nuts. So I ended up purchasing longer screws.
Hey sorry for the late response, if there is anything we can help with shoot us a email at [email protected]. There are times where we have single passenger panels available if you are still looking.You know it's not all that often, but every once in a while I catch a glimpse out of that passenger rear window and see something that could be a potential collision.
I didn't have the money at the time Rago had single panels for sale last month, now you have to order the complete set which is a deal breaker for me.
Hey There, our shelf does not work with other panels let us know if we can help with anything else.Does anyone know if the shelves for each company would work with each other? I like the Finn Fab,victory, and Caliraised, but like the rago shelf.
Bought a rack from these guys and it's pretty nice. Considering their panels.
T4R INTERIOR STORAGE - DRIVERS SIDE – Alpha foxtrot designs
Are any of these shelves quick/easy to remove if you need to? Say if I needed to use the 3rd row seating or wanted to put the dog in the back, or whatever reason?
That's a hard no for the Rago. In fact, it's a pain in the ass![]()
Are any of these shelves quick/easy to remove if you need to? Say if I needed to use the 3rd row seating or wanted to put the dog in the back, or whatever reason?
I disagree. Though it depends what you mean by "easy."
The Rago requires you removing 2 allan-key bolts and one hex head bolt. Takes less than a minute if you have the right tools in front of you.
So if it is once in a blue moon I'd say it's easy.
But because they are bolts, not something you would want to be doing every week.
I think they all use exactly the same method for mounting, so that would apply to all of them.
Yeah - I ordered molle panels, shelf, etc a while ago, and getting any sort of update from Melissa is like pulling teeth - the best I got was a canned response telling me 4-6 weeks and they are busy. I appreciate that they are busy (like everyone else), but I wouldn't recommend them and I haven't even received my order yet. Raingler, Prinzu, Gobi, SCS, and BXBuilt all have been quick in response and clear with information.
ordered my panels on March 20th and they're finally being delivered tomorrow, it's been a long wait