txbonds 97 4runner limited project

Nice. A welder is dollar-for-dollar the best purchase you can make for an off road vehicle except maybe a lunchbox locker :o Plus, you can use it to fix your barbeque :D
 
Nice. A welder is dollar-for-dollar the best purchase you can make for an off road vehicle except maybe a lunchbox locker :o Plus, you can use it to fix your barbeque :D

That's what i was thinking. Would be handy for all sorts of stuff even if it is a light weight unit. I'd have liked to get the hobart 210 dual voltage unit to grow with but it was nearly double the cost of this refurbished unit. I figure I can always upgrade later if needed.

I already have projects in mind from making my seat brackets, to attaching light tabs, to making battery brackets. :)
 
Last edited:
Congrats on the welder (and all the other goodies) I use mine all the time, its so nice doing metal projects and not having to worry about getting things welded you just do it. Have your dad so you the basics then get you some scrap steel a spool of wire and practice practice practice.:)
 
That's what i was thinking. Would be handy for all sorts of stuff even if it is a light weight unit. I'd have liked to get the hobart 210 dual voltage unit to grow with but it was nearly double the cost of this refurbished unit. I figure I can always upgrade later if needed.

I already have projects in mind from making my seat brackets, to attaching light tabs, to making battery brackets. :)

Honestly you really don't need the 220 volt welder for much of anything for offroad. Most of that is duty cycle and current flow. Most of the rigs I have seen garage built on Pirate4x4 use.... Wait for it.... A Hobart 140. It does pretty much most any weld your gonna want to do. And if your doing thicker stuff then just multi-pass it. No shame in that. I multi pass anything above 3/16 on a 110 welder.
 
Got side tracked from working on the carpet to tear apart my passenger front seat and get the feet brackets off so I could start fitting my new seats. I need to pin down the process on the passenger side before I mess with the driver side or I'll be sitting on a bucket. :)

More nastiness in the form of wads of dog hair stuck under the bottom of the seat hardware. Here you can see the stock sliders are attached directly to the feet using hardened steel rivets.
p1850448903-4.jpg


I'll go ahead and post it here but these are a total b i t c h to drill out. Not only are they the type of rivet that is probably hardened steel, but I'm guessing they press them in hot like a rivet on a skyscraper. Either way, they are press fit and solid so drilling them is lots of fun. The frustrating part is that every single foot also has a blind rivet or weld on it that you can't see. So once you finish drilling through the ones you can see the heads on, you have to locate the hidden rivet and drill and additional hole. So in the case of the one pictured, there are two visible rivets and a blind rivet between them that must be drilled out to get the feet off. I'm not looking forward to the driver side. LOL :Cry:

Here is one of them bolted to the floor pan after drilling out the rivets
p1678463224-4.jpg

p1873880807-5.jpg


Here is an idea of how the planted technology base plates will sit in the vehicle.
p1747333894-4.jpg

p1869799466-5.jpg



With a little work, I was able to line the plate up with the holes in the feet produced by drilling out the rivets. I'm thinking that I can bolt these down with some nice grade 8 hardware and then weld them after the fact for extra strength.
p1721914953-5.jpg

p1722217763-5.jpg
 
I realize this isn't too sexy and exciting but here we go anyway :)


First bracket coming together. The feet are attached using the holes created from drilling out the rivets and through the existing slots in the planted technology plate. Used grade 8 hardware with 5/16 x 1" bolts, 5/16 washer above and below and a 5/16 lock washer and nut.

It is really strong once,bolted up so in an effort to stop the rust from getting worse and having a ton of cleanup work I decided to go ahead and prime and paint. I realize if I decide to come back and weld this will mean clean/prep work and repainting but I decided to take the chance on the bolts alone working for now.

Primer

p1645815684-5.jpg


p1629104724-5.jpg


p1699093287-5.jpg




Flat black paint

p1839181849-5.jpg


p1698594208-5.jpg


p1812163298-5.jpg




Inside to finish drying and curing. I have temp in garage at 76 and humidity brought down to about 45 to 50 percent so it should cure out overnight pretty well.

p1676559359-5.jpg


p1691937714-5.jpg
 
Last edited:
Went ahead and got the drivers side bracket setup and coated with paint also. :)


Bottom of drivers seat.
p1648233840-5.jpg


Drilled pilot holes. Raised ring is the rivet and the other hole is what I call the blind rivet. Probably a tack weld.
p1741376477-5.jpg



After drilling out to 5/16, it still takes hits from a hammer to get bracket loose.
p1631674756-5.jpg



Slider underneath bracket once they come off. Sticky residue almost like glue.
p1778421151-5.jpg



All 4 feel brackets removed
p1653729218-5.jpg




And two quickly painted brackets drying
p1858268000-5.jpg





I've already decided to go back with wire brush on the feet to clean them up a,bit and to put some tack welds between foot and plate. Then I will repaint again but this initial paint will stop the rust that was already starting on the raw steel plates as they sat in the box waiting.

Next up is fitting sliders to seat bottoms.
 
Few more updates but more waiting too........


My rear bumper is in route from CBI. It was just leaving Utah transfer location on last update from truck line and should get here late next week. No pictures to share yet.



My roof rack was complete today and I am picking up on Saturday. Josh sent a picture. Looks really nice. What an awesome job Josh. Hope it's okay that I shared the picture
p1824275911-5.jpg




And got my welder setup in and put together to start learning. :)
p1786591144-5.jpg




Planning to get wiring for amp, speakers and antenna run this weekend so I can start fitting carpet.
 
Last edited:
Nice!!
Great little machine, I have one myself.
I can promise you will want a larger gas bottle though...
can't wait to see what you do with it :)
 
Nice!!
Great little machine, I have one myself.
I can promise you will want a larger gas bottle though...
can't wait to see what you do with it :)

Yeah, I figured as much. That's a 40 but Airgas said I could trade it towards an 80 at refill time if I need to.
 
HOBART FTW!!! My welders are Hobart, love them, use the crap out of them! No worries on the picture, I guess I coulda got you a better one to share but oh well. Guess I need to trim that bush...:laugh:
 
HOBART FTW!!! My welders are Hobart, love them, use the crap out of them! No worries on the picture, I guess I coulda got you a better one to share but oh well. Guess I need to trim that bush...:laugh:

It's just fine. The bike is awesome too. :)

Ill be posting a ton more pics as I paint and mount the rack I'm sure so ill do it justice with pics. :)


I'm still wondering if I should have bit the bullet and bought the 210MVP hobart but the 140 should help me learn for sure.
 
You're probly fine, mine is a 210 and over never cranked it further than half way, even doing my bumpers.

Isn't the main advantage with the 210 a better duty cycle??? And well a little more one pass capability for thicker welds??? That is how my welder buddies were explaining it to me
 
That's correct.
I also find the bigger machines are a little smoother and built more stout.

I am normally using a 220 miller matin and that thing is definitely stout. It is definitely smooth too. And easier to get the setting more fine tuned

And man oh man your doing the whole build at once. Thing is gonna be sweet to watch when you actually start getting all the stuff installed. Before and after pics are gonna be epic
 
The main reason I am thinking I should have done the 210MVP is that I hear it welds a little nicer on 115v due to the 220v components inside, and also it would give me more capability for aluminum repairs and welding.

The 140 can do aluminum but it cost a fortune to convert it for a spool gun and I'm seeing very mixed reviews on using aluminum wire without a spool gun.
 
Isn't the main advantage with the 210 a better duty cycle??? And well a little more one pass capability for thicker welds??? That is how my welder buddies were explaining it to me

IF you weld thick metals which most people do not. a 140 is just fine for 3/16 which is a beefy piece of steel, however, if you're welding up a plate bumper with miles of seems you will certainly notice the shorter duty cycle.
 
Okay I officially detest rustoleum paint. It sprays horribly compared to the krylon rust tough I've been using.

Started priming my new roof rack and am switching paint mid stream back to krylon. The krylon sprays much smoother and more even.

p1654949603-5.jpg
 
IF you weld thick metals which most people do not. a 140 is just fine for 3/16 which is a beefy piece of steel, however, if you're welding up a plate bumper with miles of seems you will certainly notice the shorter duty cycle.

Makes sense honestly. Most people won't be doing thick stuff but in the near future I will beig doing a fairly decent amount of 1/4". Basically fabricators that do it all day will notic me the difference I think.

Btw txbonds I your planning on welding aluminum then I would look more into learning how to do TIG
 

Members online

No members online now.

Forum statistics

Threads
278,312
Messages
3,554,089
Members
248,016
Latest member
Advally Service

Trending content

Back
Top