Finally got some major garage time this weekend and was busy mocking up the front axle housing, building a new hydro assist mount bracket, welding on shock mounts, steering stops, and installing the inspection port.

Welding in 98 degree heat

Everyone always knocks TG but this housing is pure beef and well fabricated.

Hydro assist ram bracket. Not my best welding but with the gusset, it isn't going anywhere

Kinda nerving to cut a 60mm (2 3/8") hole in a $770 housing. I didn't have TG install the inspection port because it would have interfered with where my hydro ram sits.

Hopefully I got it welded up good enough to not leak

Fully welded, ready for some paint

Couple coats of self etch primer before the hammered black