Update:
1) The Front Diff is Done. This included Nitro 4.56 Gears, Front ARB Air Locker, and other various Marlin Crawler Internal Upgrades:
2) Our Icon 2.5" Front Coilovers (with Remote Reservoir and Adjustments), Front 2.5" Air Bumps/Mounts, 2.5" Diameter 12" Travel Rear Shocks (with Remote Reservoir and Adjustments), and Rear 2.5" Air Bumps/Mounts are in hand:
3) I spoke with LeadNav again and Damian convinced me to spend a bit more and swap from the iPad Air 2 (3 Core A8X Processor) to an iPad Pro 10.5 (4 Core A10X Processor). Otherwise he feared that we would experience Lag or System Reboot issues during the race. So I returned the iPad Air 2 and LifeProof case and picked up a iPad Pro 10.5, LifeProof case, and Screen Protector. We definitely didn't have the budget for a new Pro 10.5, so a refurb will have to work (the one I got had really high reviews and a 90-day warranty).
4) We had another call with our Wrap company - SoCal Exotic Wraps - and finalized all of the details for the design, wrap, logos, etc. It'll take us 2-3 days to complete the wrap the week before KOH.
5) I can't remember if I've already covered this one, but I worked with Aeromotive to eliminate any potential fuel starvation issues by integrating their new Jet Siphon technology from their Apex Phantom kit into our Phantom 200. We'll now have fuel pick-up at the Front and Rear of the fuel cell. I'll be installing this and a ton of other small things when I am in CA in January giving the team a hand.
With 44-Days till KOH, we still feel good about our timeline. Given various delays, we'll likely now only have 1-week or so for testing and tuning before the race. But it will be done and will be ready to race! I've learned that every small delay definitely adds up. It's not ideal, but that's racing!
I'm really thankful that our core team is so close. Many of the key players are also great friends. We all communicate multiple times a day and work together really well to solve issues as a team.
The final handoff to RockSolidToys (Atlas II, Rear Suspension, Driveshafts, and Other Small Items) and Otwell Fabrication (Cage) is now set in stone for this weekend!