thomasugenius
New member
I will have pics of the 1" soon! NTB had to order 2 more shocks, all of them needs to be replaced, along with the control units (canisters x 2) and the lines. Going in the shop in 2 more days.
I have also called around and the labor to do the enire job was anywhere from 4 hours to 10 hours. A huge difference. Always good to call other companies...
I have also called around and the labor to do the enire job was anywhere from 4 hours to 10 hours. A huge difference. Always good to call other companies...