Knocked out some major work this weekend on the 4-link. For the most part things went pretty smoothly since I did a lot of prepping prior to this weekend and that took just about all the guesswork out.
Friday night I got home from work and immediately got to work pulling brake lines, fuel lines, bumper, fuel tank, and the axle.
Saturday my buddy Kyle came over and we went to town on cutting everything off the axle and frame. All 5 link mounts got cut off the axle, and 3 more crossmembers got cut off the frame rails, along with link mounts. I also needed to cut off the coil buckets too, so they can be rewelded back a few inches to match the axle. Once we got everything stripped down to bare frame (which is a hell of a lot of work), we started mocking things up and tacking them in place. Once I cut the stock crossmember off behind the t-case, the frame rails pulled in almost 1/4”. So I had to trim the crossmember and brackets back a little bit to fit between the frame rails. Once we got it all in place, we pulled the axle under the truck and test fitted the new links. Those lower links are heavy! While we were putting the links in place, I had the upper frame side link put in place and reached over to grab the bolt next to me while Kyle was wiggling his side into place. While he was wiggling his side, my side slid out and the joint landed right on my face next to my eye. Boy did that one hurt!! Even with all that beer we were drinking. Now I got a nice puffy red mark next to my eye. Luckily after that link was bolted in, we were ready to cycle the suspension, so the excitement washed away the pain along with celebratory beers once we determined everything was lined up properly and cycled perfectly. At that point we it was getting too late to work, so we cleaned up and jumped in the spa for a few beers to relax after 14 plus hours of work and almost a 36 pack between the two of us.
Sunday we came back out to pull everything off for final welding. We quickly realized a little mistake of not thinking ahead. When we tacked on the axle side lower link brackets, we had the joint bolted up to it. Well when we went to pull the bolt out, we realized we put the bolt in from the wrong direction so it didn’t have enough room for the bolt to slide all the way out. Good think everything was just tacked on! I went to town on welding everything together while Kyle did some prep work and painted the new link tubes. Gloss black is all I had left, so now I have some shiny black links hahah. Another weird thing that happened was after I welded on the frame plates, the frame spread out by 5/8”! That was extremely frustrating since I just got done cutting my crossmember 1/4” the day before. We tried to use a hi-lift to pull the frame rails back together but were only able to get 1/4” out of it leaving 3/8” gap still. So we just made some smaller frame plates out of 3/16” plate to fill the gap while still keeping the structural integrity of things. From there the last thing needed was the rear crossmember between the gas tank and axle. Once that was done, we put the axle back in and cycled everything to insure final fitment. Everything was perfect! We checked pinion angle throughout travel and it changed by only about 1°. We also checked driveshaft plunge and that only changed by 1/2”. All in all I am extremely happy with how the link geometry turned out at this point.
Another awesome thing from yesterday was [MENTION=28464]eimkeith[/MENTION] was in So Cal this weekend and made it out to Yucaipa to hang out and have a beer on his way back to NC. It was awesome to finally meet the guy that I have been bouncing tons of ideas off of for the past couple years.
Now all I have left to do is, weld in the coil buckets, cut back my bumper a few inches, tub the wheel wells back a few inches, install the rear bumper and fuel tank. Then eventually get to installing the new hydro bumps. Still a ton of work left to do, but it’s all easy compared to what we accomplished this weekend.
Obviously some pics for you guys.
Everything that got cut off.
Motivation.
Stock links are 20” and 11” long
New links are about 42” and 42.5” long
A couple things to note in this picture.
1) The CAT is just hanging down since it was in the way of the new crossmember. This will be replaced by a muffler.
2) The lower link bracket on the axle will also act as the bump stop strike plate.
Frame side upper link mount on the frame plate.
I will post more pics as I get further into things. If anyone wants any specific pictures or measurements, let me know.