Both quotes are from previous post by Buckfever.
"I tried to observe for that expansion, when I was greasing up the front slide yoke zerk, I couldn't see anything after pumping a good amount in so I stopped. I don't have a good rule of thumb on that. "
(you can see the drive saft expand, but it is difficult to observe)
"For the U joint, you can actually hear when it finally starts to express, although you can visually confrim it, 6-7 pumps is all it took. I'm putting in around 16-17 pumps on the Slide Yoke fittings. I've read that you don't want to put too much, but then the guys that are successful at eliminating the clunck via greasing the driveshaft, have reported being aggressive."
(It took me more than 20 pumps on the front and back slide yoke to make the shafts expand. The shafts only expanded about the size of this dash ( - ). I hope that is not too much!)
Thanks for the great pics Buckfever!
Cheers