the last week hasn't been much of a progress, mainly because I kind of ran out of things to work on lol.
I did upgrade the RTT to a Self Inflating (false advertisement) 4" air pad in place of the factory pad it came with. Night and day difference. A $20 amazon rechargeable pump fills up the pad in no time at all and when its deflated I can keep it in the tent along with bedding and still close it with ease. Now its just to be able to get out and actually do some camping damn it!
knowing myself, I am full aware that my rig won't stay as is for very long I went ahead and started plotting a project for sometime next year that should cross off just about everything I will ever want to do to my build...
Solid Axle swap is officially under planning/budgeting steps..
Here is what I have come up with so far:
-2010 F250 Dana 60 front and Sterline 10.5" rear axle (can be sourced locally from the junkyard for around $600 total)
-4.88 or 5.xx gearing
-ARB lockers
-3-link front/rear setup
-LC steering box
-rear axle truss
-12-14" ORI front struts with 14-16 ORI rear struts
-custom driveshafts (haven't figured out best route for this yet)
-limit straps to keep everything in check
The current pricing of things with some buffer looks like falls right around the $16k mark (mainly because of the hefty $5500 price tag on the ORI's, but they have internal bump stops, don't require springs, and are fully adjustable down to the necessary ride height) which sounds bad, until I started figuring in the pricing of components I could sell off from my current build. If I could get even remotely close to my asking price for things like my ICON shocks, RCV axles, complete front/rear 4.56 air locked front/rear, controls arms, spindles, skids, etc etc I could potentially end up somewhere in the 8.5-9.5K range for a completely badass SAS 4th gen front and rear..
I know I'm completely underplaying the amount of work that needs to happen to make this setup function, but the more I look at other builds the less scary it looks... lots of grinding and cutting, and grinding and cutting some more, and a ton of welding, but nothing that I couldn't do. Making sure all the measurements are spot on is the key process, but once everything is laid out to get it burned it is just a matter of time... am I crazy here? Probably, but I'm pretty close to a finalize list after which I think I'm slowly going to start keeping an eye out for various parts that I need to acquire over time. We'll see what sort of sale I come across between the holidays to hopefully take off a healthy chuck from the price as well

arty: