So the sleeve is in and it’s as close as I can get it. It’s tack welded in place on the outside. I went to do the inside of the frame sleeve and it was too awkward. I need to get it up in the air much higher.
Tomorrow I’ll get it up higher and tack it in place so I can remove all the clamps and then start burning it in.
The primer I used let’s me burn through it so I’m happy I didn’t have to have bare metal at the joint.
I’ve been doing the Z welding pattern to make sure I’m hitting both sides for penetration.
Sent from my iPhone using Tapatalk