The long-awaited Shrockworks slider install
After the long, long wait (18 weeks), of course I had to go out of town on business and couldnt install the &%$#! things until today.
A little disappointed that right out of the unopened box, each rail has a pretty good gouge in it. No damage to the box, spray-foam packaging intact, and its been sitting safely in the garage the whole time. Will give them a call tomorrow, but there was rust forming where the powder coat was down to bare metal, so it didnt happen here.
Nonetheless, build quality is excellent. I see great welds on a daily basis, and these are top notch. Like the design. Fit was really good....did have to apply a little floor jack love to the angled piece on the passenger side. Anyone who has installed these probably has done the same. Even the gas-tank strap issue was really a non-issue. The stick nuts are a little awkward, but after grinding off a few square edges to slip through frame holes, and removing one plastic cap for access, plus if you can think in 3 dimensions to line them up, the install wasnt too bad. I would recommend running a tap through the stick nut threads in advance to make engagement much easier. So, damage issue aside for now, well done and executed.
With lots of talking and pointing, and a lunch break, maybe 3 hours start to finish. Helps to have a mechanically-inclined brother, and a farmer friend with a great shop and every tool on the planet. Farmers just flat out rock..... [if you ate today, thank a farmer]....even if they look like some cross-breeding of Larry the Cable Guy for a dad and an Amish mom. :biggrin2:
Here are a few pics. Note the tools of the trade in the photo reflections. One is pretty old.....spring-loaded seat and all.