Terrific contribution :loco:
Just my opinion, but 12 weeks for sliders is ridiculous. If you can't fab and ship sliders in less than 3-4 weeks you need to figure out how to do it faster. All these parts are made from a jig. Can't take more than a day to weld a bumper, much less a set of sliders.
I keep seeing more and more of these posts lately and it's getting tiring seeing. Yes the wait is long, yes the lead times may be off, but that is something you should have educated yourself on prior to purchasing.
Do your freaking research before ordering anything and know what your getting into.
If you don't bother to research the company or take charge of the scenario once it goes sour I don't think you have no room to complain. But, that's just my opinion.
Some people easily confuse an estimate with a guarantee.
1) If it only takes a day to weld a bumper, why not make one yourself? Sounds like it'd be pretty lucrative.
2) The sliders aren't made from a jig.
3) If sliders for one specific model year of 4Runner was the only thing they made, then I agree. But they make a large variety of parts for a large variety of makes, models and years. They are a small shop, and there's only so many parts they can produce at once. If you think you can do better, then open up your own shop. It sounds like you'd make a killing with your great ideas.
While I understand your frustration, comparing a company like Shrockworks to Toyota is a bit ridiculous. First, they are pretty much at opposite ends of the spectrum when it comes to operations and economies of scale. Second, "to your specifications"? That's a bit amusing to say the least. How much input do we really have when we "custom order" a 4Runner. Sure, we may choose third-row seats or something, but it's not like we're custom designing a bumper, engine, or transmission.I'm on week 15 waiting for a set of Shrockworks sliders. By contrast, Toyota built an entire sport utility vehicle to my specifications IN JAPAN and got it to me in less time. (Both companies promised 12 week delivery. One exceeded expectations; one not so much)
That is indeed a fair question. I would love to see the bumper I just ordered from them arrive earlier than expected.If SW products are that great and the demand is so high, why wouldn't they hire some competent staff and grow their business?
I just looked at their 5th Gen sliders and see nothing special about them. They look very basic and have a max of 11 welded joints. So 1 week to weld each joint, plus a week for powder coat, plus another for delivery. Now I understand why it takes them so long. Those must be some freaking amazing welds.
I just looked at their 5th Gen sliders and see nothing special about them. They look very basic and have a max of 11 welded joints. So 1 week to weld each joint, plus a week for powder coat, plus another for delivery. Now I understand why it takes them so long. Those must be some freaking amazing welds.
If you don't like it, don't order from them. I visited their shop. They're not perfect, but they're cranking out parts by the truckload (literally, a truck came in twice while I was there to cart off finished units for powder coating and drop off freshly powder coated products ready to be shipped). You're not going to accomplish anything but aggravating yourself by badmouthing them.
In talking to one of their designers, I got the impression that they'd love to get ahead of the game and have inventory just lying around waiting to go, but there is enough demand for their products that they can't get ahead. That means you have to wait 12 weeks or more before they can make sliders. That doesn't mean it takes 12 weeks to make sliders.
Sorry but at this point if you order SW stuff and don't know this reputation you did a really crappy job of researching. Their stuff is great, but everyone who actually researches before they buy know its going to take a long time.
If a company could just mass produce this stuff with the same quality don't you think that deezee or Westin would be making these buy now?