Didn't get a lot done last weekend so no update, cleaned the shop. Cleaned for 2 hours, installed a blower motor in a Bonneville. Managed to get the plasma torch out for a hour or so. Cut off old spring hanger, torsion adjustment bracket and my raised horsecollar.
Me and rylan got lots done today. Was so busy only got a few pics. We disconnected the wiring harness from ecm, all the vacuum hoses, brake lines, heater hoses, battery. Anything that wont allow body to be lifted off the frame/drivetrain.
We than removed both front seats/console. Here's rylan taking off the shifter boot and t case shifter

While he worked inside I took off the crossmember.

Then rylan helped me remove the transfer case bolts after draining of coarse.

Here's the case out

Made a hoist for the transmission

Than we moved to the rear where we switched holes in the shackle again
Here's ride height

Full droop

Didn't get after shot but it has 6.5" of down travel and we raised the rear an 1".
It's still a good 3" higher in the front
