The weekend is quickly approaching.. getting anxious about tackling the LC200 steering rack swap along with the Total Chaos cam tabs and (forgot brand) cam eliminator plates project..
I already made a parts-run to my parents house to drop off all the components, and the remaining hardware arrived from McMaster yesterday. Still not sure exactly how long i'll need the bolts to be so I have 2 different sizes for each side and hoping like hell it works out
I thought I had taken off my diff-drop spacers.. but apparently not.. those are still on and I am debating whether to leave them in or take them off after I drop the diff..
A while ago I bought some lower control arms from Rock Auto, not OEM, but decent quality ones.. I am planning on swapping these in since my OEM ones has over 150k miles on them now and the bushings look tired, and not sure what the condition of the ball joint is after running 35's for the past year.. If I planned to run them long-term I don't think I would use non-oem lowers... but since I have pretty big hopes of going LT sometime in the next 4-6 months I think it should be OK to use non-OEM lower arms for a bit.
The plan for the swap is basically to dis-assemble the entire front end..
-remove the coilovers
-remove lower arms
-remove spindles
-remove axles
-drop diff
-replace motor mounts with 1/4" spacer plates (thinking about lightly tack-welding these to the mounts so they don't move).
-remove OEM rack
-cut-off old cam tabs
-weld on new tabs
-test fit rack
-notch subframe to sit rack down low
-mark and cut passenger side hole
-weld in reinforcement tube/plate
-install rack & center
-drill out spindles for 3/4" bolt
-reassemble lowers with spindles
-test rack
-install diff & axles
-install coilovers
-drink beer.
Sounds pretty straight-forward... but I guess we shall see.. I am still not 100% certain that my outer tie-rods are short enough.. hoping like hell i pulled the measurements correctly, but will find out really quick once I pull the factory rack out, lay it all flat, and pull measurements.. I'll need to do this before I modify anything just in case.. I'm planning on taking 2 full days to do this.. and can't afford to be down for an additional week to come up with Plan b if this doesn't work lol. Wish me luck!