Qjake
New member
Got the skids yesterday and they're pretty stout! 3/16" steel, nice welds, nice paint, an aluminum Icon emblem riveted on front and zinc hardware. I doubt the emblem or the paint will last but we'll see I also would have liked stainless hardware but... :shrug:
There were some concerns about drilling out some holes on the LCA. I haven't mounted them yet but took a quick look at the 2 holes (one on each arm) that need to be drilled out to 1/2" and don't see it being an issue.:nono:
Instructions so you all can locate the hole to drill out
There were some concerns about drilling out some holes on the LCA. I haven't mounted them yet but took a quick look at the 2 holes (one on each arm) that need to be drilled out to 1/2" and don't see it being an issue.:nono:
Instructions so you all can locate the hole to drill out