GrantK
New member
…two or three extra 36 hour days per week? :shrug:
I’ve got an ever growing pile of parts for mods and no time to install them. I’ve got sheet metal for brackets, a complete after-market stereo system (including sound deadening), ham radio gear, dual battery controller, most of my ICON lift, shock guard, front diff drop, my Borla CAT back arrived today, eLocker guard, assorted switches, fuse boxes, in-line fuses, ARB compressor, A bunch of Shrockworks stuff is on order and should start showing up soon. My Hella horns are mounted but not wired up.
To this add that I haven't even ordered my ARB front locker, roof rack and aux lighting and I definitely feel like a one armed paper hanger.
Sorry, just venting
I’ve got an ever growing pile of parts for mods and no time to install them. I’ve got sheet metal for brackets, a complete after-market stereo system (including sound deadening), ham radio gear, dual battery controller, most of my ICON lift, shock guard, front diff drop, my Borla CAT back arrived today, eLocker guard, assorted switches, fuse boxes, in-line fuses, ARB compressor, A bunch of Shrockworks stuff is on order and should start showing up soon. My Hella horns are mounted but not wired up.
To this add that I haven't even ordered my ARB front locker, roof rack and aux lighting and I definitely feel like a one armed paper hanger.
Sorry, just venting