Bfaulken's build thread "Duke"

Decided to start doing some maintenance for the summer today. I was greasing the driveshaft and I found that a zerk fitting was sheared off thanks to the factory gas tank skidplate. Once I got the leftover bolt out, I picked up a few zerk fittings. Put one in, applied grease, then swapped the zerk for a set screw.

**They are M6-1.0 for anyone wondering, I couldnt find a definite spec on the forum. I also picked up some 12mm set screws so I wouldnt have to worry about another broken zerk.

pic of the set screw in, once its tight its pretty much flush with the OD of the slip yoke:
 
Last edited:
Woah, how have I missed this thread?

I'm in Fort Collins as well. Hope you can join us for some wheeling this summer!
 
Woah, how have I missed this thread?

I'm in Fort Collins as well. Hope you can join us for some wheeling this summer!

I mean its not super noteworthy yet :sadwave: but its getting there! The build sat at a standstill for about a year after the whole diff fiasco...I'm in school (CSU) and haven't been working during the school year until the last month or so, so I haven't been able to do many upgrades.

I'm hoping to go quite a bit this summer! My roommate has a '94 so we're just waiting for trails to open up so we can get a group together to go. In the meantime I have a few things to take care of in terms of maintenance...and hopefully the elocker swap before too long!

Did I read somewhere that you do alignments/work somewhere that does? If so, would you mind either posting or PM'ing me details? I checked my tires today and they're starting to wear way more on the outside edges, so I want to get that squared away relatively soon.
 
Butt Implant!

At the beginning of the summer I got a job at a machine/fab shop, and the welders said they'd teach me how to weld. I decided to take on a new project: a rear bumper. I did everything myself: shearing pieces, grinding, welding, and powder coating. I had 2 pieces bent with a press-break because they're pretty technical and I didn't want to screw up the tooling or anything.

I started with a 4x8 piece of plywood, cut it up and fit it how I wanted it to look. Took several days of head-scratching, measuring, and cutting but I finally got that part done.



From that I got measurements and dug through the scrap dumpster at work to find all the pieces I needed. I sheared everything to size, had the press break operator at work bend a few pieces for the frame mounts, then got to welding.

It took a few months of working in my free time, but I finished all the welding and grinding on Wednesday. Then I powder-coated it black, bought new mounting bolts today and put it on!









 

Members online

No members online now.

Forum statistics

Threads
278,309
Messages
3,554,071
Members
248,016
Latest member
Advally Service

Trending content

Back
Top